Skip to content

Pull requests: pingcap/tidb

Author
Filter by author
Loading
Label
Filter by label
Loading
Use alt + click/return to exclude labels
or + click/return for logical OR
Projects
Filter by project
Loading
Milestones
Filter by milestone
Loading
Reviews
Assignee
Filter by who’s assigned
Sort

Pull requests list

executor: Optimize statements summary by using buffer pool release-note-none Denotes a PR that doesn't merit a release note. size/M Denotes a PR that changes 30-99 lines, ignoring generated files.
#58544 opened Dec 26, 2024 by crazycs520 Loading…
2 of 13 tasks
lightning: gRPC cancel should trigger retry release-note-none Denotes a PR that doesn't merit a release note. size/XS Denotes a PR that changes 0-9 lines, ignoring generated files.
#58542 opened Dec 26, 2024 by lance6716 Loading…
1 of 13 tasks
ddl: support pre-split index regions before creating index (#57553) do-not-merge/cherry-pick-not-approved release-note-none Denotes a PR that doesn't merit a release note. size/XXL Denotes a PR that changes 1000+ lines, ignoring generated files. type/cherry-pick-for-release-7.5 This PR is cherry-picked to release-7.5 from a source PR.
#58541 opened Dec 26, 2024 by ti-chi-bot Loading…
1 of 13 tasks
planner, expr: eval readonly user var during plan phase (#54462) | tidb-test=pr/2462 cherry-pick-approved Cherry pick PR approved by release team. needs-1-more-lgtm Indicates a PR needs 1 more LGTM. release-note Denotes a PR that will be considered when it comes time to generate release notes. sig/planner SIG: Planner size/L Denotes a PR that changes 100-499 lines, ignoring generated files. type/cherry-pick-for-release-8.5 This PR is cherry-picked to release-8.5 from a source PR.
#58540 opened Dec 25, 2024 by ti-chi-bot Loading…
2 of 13 tasks
br: precheck disk space only when checkpoint first run (#58525) do-not-merge/cherry-pick-not-approved ok-to-test Indicates a PR is ready to be tested. release-note-none Denotes a PR that doesn't merit a release note. size/S Denotes a PR that changes 10-29 lines, ignoring generated files. type/cherry-pick-for-release-8.5 This PR is cherry-picked to release-8.5 from a source PR.
#58538 opened Dec 25, 2024 by ti-chi-bot Loading…
1 of 13 tasks
*: improve the user experience for using Ctrl+C to make tidb exit approved needs-1-more-lgtm Indicates a PR needs 1 more LGTM. release-note-none Denotes a PR that doesn't merit a release note. size/M Denotes a PR that changes 30-99 lines, ignoring generated files.
#58537 opened Dec 25, 2024 by tiancaiamao Loading…
1 of 13 tasks
br: precheck disk space only when checkpoint first run (#58525) do-not-merge/cherry-pick-not-approved ok-to-test Indicates a PR is ready to be tested. release-note-none Denotes a PR that doesn't merit a release note. size/M Denotes a PR that changes 30-99 lines, ignoring generated files. type/cherry-pick-for-release-8.1 This PR is cherry-picked to release-8.1 from a source PR.
#58535 opened Dec 25, 2024 by ti-chi-bot Loading…
1 of 13 tasks
lightning: fix lightning-ctl dump checkpoint file name approved lgtm ok-to-test Indicates a PR is ready to be tested. release-note-none Denotes a PR that doesn't merit a release note. size/S Denotes a PR that changes 10-29 lines, ignoring generated files.
#58533 opened Dec 25, 2024 by River2000i Loading…
1 of 13 tasks
metrics: add col/idx name(s) for BackfillProgressGauge and BackfillTotalCounter (#58380) cherry-pick-approved Cherry pick PR approved by release team. needs-1-more-lgtm Indicates a PR needs 1 more LGTM. release-note-none Denotes a PR that doesn't merit a release note. size/L Denotes a PR that changes 100-499 lines, ignoring generated files. type/cherry-pick-for-release-8.5 This PR is cherry-picked to release-8.5 from a source PR.
#58531 opened Dec 25, 2024 by ti-chi-bot Loading…
1 of 13 tasks
metrics: add col/idx name(s) for BackfillProgressGauge and BackfillTotalCounter (#58380) do-not-merge/cherry-pick-not-approved release-note-none Denotes a PR that doesn't merit a release note. size/L Denotes a PR that changes 100-499 lines, ignoring generated files. type/cherry-pick-for-release-8.1 This PR is cherry-picked to release-8.1 from a source PR.
#58530 opened Dec 25, 2024 by ti-chi-bot Loading…
1 of 13 tasks
br/stream: allow pitr to create oversized indices (#58433) do-not-merge/cherry-pick-not-approved release-note Denotes a PR that will be considered when it comes time to generate release notes. size/L Denotes a PR that changes 100-499 lines, ignoring generated files. type/cherry-pick-for-release-7.5 This PR is cherry-picked to release-7.5 from a source PR.
#58529 opened Dec 25, 2024 by ti-chi-bot Loading…
2 of 13 tasks
br/stream: allow pitr to create oversized indices (#58433) do-not-merge/cherry-pick-not-approved release-note Denotes a PR that will be considered when it comes time to generate release notes. size/L Denotes a PR that changes 100-499 lines, ignoring generated files. type/cherry-pick-for-release-8.1 This PR is cherry-picked to release-8.1 from a source PR.
#58528 opened Dec 25, 2024 by ti-chi-bot Loading…
2 of 13 tasks
br/stream: allow pitr to create oversized indices (#58433) do-not-merge/cherry-pick-not-approved release-note Denotes a PR that will be considered when it comes time to generate release notes. size/M Denotes a PR that changes 30-99 lines, ignoring generated files. type/cherry-pick-for-release-8.5 This PR is cherry-picked to release-8.5 from a source PR.
#58527 opened Dec 25, 2024 by ti-chi-bot Loading…
2 of 13 tasks
executor: change the evaluation order of columns in Update and Insert statements (#57123) do-not-merge/cherry-pick-not-approved ok-to-test Indicates a PR is ready to be tested. release-note-none Denotes a PR that doesn't merit a release note. size/XXL Denotes a PR that changes 1000+ lines, ignoring generated files. type/cherry-pick-for-release-7.1 This PR is cherry-picked to release-7.1 from a source PR.
#58524 opened Dec 25, 2024 by ti-chi-bot Loading…
1 of 13 tasks
planner: convert cartesian semi join with other nulleq condition to cross semi join with equal condition (#58075) do-not-merge/cherry-pick-not-approved release-note Denotes a PR that will be considered when it comes time to generate release notes. sig/planner SIG: Planner size/M Denotes a PR that changes 30-99 lines, ignoring generated files. type/cherry-pick-for-release-8.5 This PR is cherry-picked to release-8.5 from a source PR.
#58521 opened Dec 25, 2024 by ti-chi-bot Loading…
1 of 13 tasks
planner: fix idxMergePartPlans forget to deal with RootTaskConds (#58507) cherry-pick-approved Cherry pick PR approved by release team. release-note Denotes a PR that will be considered when it comes time to generate release notes. sig/planner SIG: Planner size/S Denotes a PR that changes 10-29 lines, ignoring generated files. type/cherry-pick-for-release-8.5 This PR is cherry-picked to release-8.5 from a source PR.
#58520 opened Dec 25, 2024 by ti-chi-bot Loading…
1 of 13 tasks
planner: fix idxMergePartPlans forget to deal with RootTaskConds (#58507) do-not-merge/cherry-pick-not-approved release-note Denotes a PR that will be considered when it comes time to generate release notes. sig/planner SIG: Planner size/XXL Denotes a PR that changes 1000+ lines, ignoring generated files. type/cherry-pick-for-release-8.1 This PR is cherry-picked to release-8.1 from a source PR.
#58519 opened Dec 25, 2024 by ti-chi-bot Loading…
1 of 13 tasks
planner: fix idxMergePartPlans forget to deal with RootTaskConds (#58507) do-not-merge/cherry-pick-not-approved release-note Denotes a PR that will be considered when it comes time to generate release notes. sig/planner SIG: Planner size/XXL Denotes a PR that changes 1000+ lines, ignoring generated files. type/cherry-pick-for-release-7.5 This PR is cherry-picked to release-7.5 from a source PR.
#58518 opened Dec 25, 2024 by ti-chi-bot Loading…
1 of 13 tasks
planner: fix idxMergePartPlans forget to deal with RootTaskConds (#58507) do-not-merge/cherry-pick-not-approved release-note Denotes a PR that will be considered when it comes time to generate release notes. sig/planner SIG: Planner size/XXL Denotes a PR that changes 1000+ lines, ignoring generated files. type/cherry-pick-for-release-6.5 This PR is cherry-picked to release-6.5 from a source PR.
#58517 opened Dec 25, 2024 by ti-chi-bot Loading…
1 of 13 tasks
planner: fix idxMergePartPlans forget to deal with RootTaskConds (#58507) approved do-not-merge/cherry-pick-not-approved needs-1-more-lgtm Indicates a PR needs 1 more LGTM. release-note Denotes a PR that will be considered when it comes time to generate release notes. sig/planner SIG: Planner size/L Denotes a PR that changes 100-499 lines, ignoring generated files. type/cherry-pick-for-release-7.1 This PR is cherry-picked to release-7.1 from a source PR.
#58516 opened Dec 25, 2024 by ti-chi-bot Loading…
1 of 13 tasks
domain,util: Update BR log messages approved lgtm ok-to-test Indicates a PR is ready to be tested. release-note-none Denotes a PR that doesn't merit a release note. size/XS Denotes a PR that changes 0-9 lines, ignoring generated files. skip-issue-check Indicates that a PR no need to check linked issue.
#58514 opened Dec 24, 2024 by dveeden Loading…
1 of 13 tasks
*: add sql variable @@tidb_accelerate_user_creation_update release-note-none Denotes a PR that doesn't merit a release note. size/L Denotes a PR that changes 100-499 lines, ignoring generated files.
#58512 opened Dec 24, 2024 by tiancaiamao Loading…
1 of 13 tasks
planner: Fix expression rewriting and method signature mismatch in plan cache do-not-merge/needs-triage-completed needs-ok-to-test Indicates a PR created by contributors and need ORG member send '/ok-to-test' to start testing. release-note-none Denotes a PR that doesn't merit a release note. size/S Denotes a PR that changes 10-29 lines, ignoring generated files.
#58506 opened Dec 24, 2024 by dash12653 Loading…
1 of 13 tasks
ddl: release the limit of reorg worker count do-not-merge/needs-linked-issue do-not-merge/needs-tests-checked release-note-none Denotes a PR that doesn't merit a release note. size/XS Denotes a PR that changes 0-9 lines, ignoring generated files.
#58502 opened Dec 24, 2024 by fzzf678 Loading…
13 tasks
planner: Prune topN schema for avoiding no-need column exchange ok-to-test Indicates a PR is ready to be tested. release-note-none Denotes a PR that doesn't merit a release note. sig/planner SIG: Planner size/XXL Denotes a PR that changes 1000+ lines, ignoring generated files.
#58500 opened Dec 24, 2024 by EricZequan Loading…
2 of 12 tasks
ProTip! What’s not been updated in a month: updated:<2024-11-25.