bump go1.20 #286
ci.yml
on: pull_request
Matrix: build
Matrix: unit
Matrix: functional
Matrix: upload
Annotations
5 errors
build (1.18, ubuntu-22.04)
Process completed with exit code 1.
|
build (1.18, windows-2022)
The job was canceled because "_1_18_ubuntu-22_04" failed.
|
build (1.18, windows-2022)
The operation was canceled.
|
build (1.18, macos-12)
The job was canceled because "_1_18_ubuntu-22_04" failed.
|
build (1.18, macos-12)
The operation was canceled.
|