Skip to content

Merge pull request #89 from MilagrosMarin/element-dlc-test #39

Merge pull request #89 from MilagrosMarin/element-dlc-test

Merge pull request #89 from MilagrosMarin/element-dlc-test #39

Triggered via push October 3, 2023 16:14
Status Failure
Total duration 23m 35s
Artifacts 1

test.yaml

on: push
devcontainer-build  /  devcontainer-build
23m 23s
devcontainer-build / devcontainer-build
Matrix: tests
Fit to window
Zoom out
Zoom in

Annotations

10 errors
tests (3.9, 8.0)
Process completed with exit code 1.
tests (3.8, 5.7)
Process completed with exit code 1.
tests (3.10, 8.0)
The job was canceled because "_3_9_8_0" failed.
tests (3.10, 8.0)
Process completed with exit code 1.
tests (3.9, 5.7)
The job was canceled because "_3_9_8_0" failed.
tests (3.9, 5.7)
Process completed with exit code 1.
tests (3.7, 5.7)
The job was canceled because "_3_9_8_0" failed.
tests (3.7, 5.7)
The operation was canceled.
tests (3.10, 5.7)
The job was canceled because "_3_9_8_0" failed.
tests (3.10, 5.7)
The operation was canceled.

Artifacts

Produced during runtime
Name Size
image-devcontainer-element_deeplabcut Expired
2.16 GB